Renogy 12V 100Ah LiFePO4 battery (mini size)
Quick answer

For about 1,200 Wh a day of cabin loads, our sample uses three 12V 100Ah LiFePO4 batteries (3,840 Wh), 400W of solar, a 40A MPPT controller and a 1,000W inverter.

Key points
  • About 1,200 Wh/day of example loads.
  • 3,840 Wh of 12V LiFePO4 covers the 3,261 Wh two-day target without sun.
  • 400W of panels refills a day's use in good sun (estimate).

The load list

Example loads; replace them with yours in the Power Planner.

DeviceWatts × hoursWh/day
LED lights, 6 × 8 W48 W × 5 h240
12V water pump60 W × 0.5 h30
Small fridge (example)≈30 W average × 24 h720
Phones and laptop70 W × 3 h210
Total1,200

Sizing math

Battery: 1,200 Wh/day × 2 day(s) of autonomy ÷ 0.92 inverter ÷ 0.80 usable ≈ 3,261 Wh (0.92 from the NREL PVWatts manual, 0.80 from Victron LiFePO4 data). 3 × 12V 100Ah LiFePO4 batteries (1,280 Wh each: 12.8V × 100Ah) give 3,840 Wh as a 12V bank. See how to size a battery bank.

Solar: 1,200 Wh ÷ (4 peak sun hours × 0.77, the PVWatts V1 derate) ≈ 390 W of panels. We use 400W. Check your site's sun hours in NREL PVWatts and size for your worst month. See solar panel sizing.

Controller: 400W ÷ 12V ≈ 33A of charge current, so a 40A MPPT controller has headroom. Keep the array's open-circuit voltage under the controller's input limit in the coldest weather. See charge controllers.

Inverter: the largest AC load here is a laptop charger, so a 1,000W pure sine inverter is plenty. Its idle draw counts against the battery; switch it off when unused.

Parts list

The main parts. Size fuses, breakers and cable from each maker's manual and a wire-gauge table.

Renogy 12V 100Ah LiFePO4 battery (mini)

Renogy 12V 100Ah LiFePO4 battery (mini)

Three of these, in parallel, for a 3,840Wh 12V bank.

Check price on Amazon (opens in a new tab)
Renogy 200W solar panel

Renogy 200W solar panel

Two 200W panels for a 400W array.

Check price on Amazon (opens in a new tab)
Renogy Rover 40A MPPT charge controller

Renogy Rover 40A MPPT charge controller

40A MPPT controller for the 400W array.

Check price on Amazon (opens in a new tab)
Renogy P2 1000W pure sine inverter (12V)

Renogy P2 1000W pure sine inverter (12V)

1,000W pure sine inverter for AC loads.

Check price on Amazon (opens in a new tab)
Victron SmartShunt 500A battery monitor

Victron SmartShunt 500A battery monitor

Shows state of charge so you know what's left.

Check price on Amazon (opens in a new tab)
Klein Tools MM400 multimeter

Klein Tools MM400 multimeter

For checking voltages during install.

Check price on Amazon (opens in a new tab)

Wiring outline

Panels → fused combiner → PV disconnect → MPPT controller → fused battery bus → batteries in parallel. The inverter connects to the battery bus through its own fuse and switch. The shunt sits on the battery negative so it sees all current. DC loads (pump, lights) run from a fused DC panel off the bus.

This is a planning outline, not a wiring diagram. Follow each manufacturer's manual, fuse every positive conductor close to the battery, and have a qualified installer check the work. Local codes apply to buildings and vehicles.

FAQ

Can I use lead-acid batteries instead?

Yes, but you'd need about twice the rated capacity for the same usable energy, because lead-acid is usually planned at 50% depth of discharge. See LiFePO4 vs lead-acid.

Where do I go next?

Try the power planner to put numbers to your own situation, or see the product picks on the deals page.

Terms used here

Watt (W)
Rate of power use or production.
Watt-hour (Wh)
Energy: one watt for one hour.
Depth of discharge (DoD)
Share of a battery's capacity that is used.
State of charge (SoC)
How full a battery is, as a percentage.
LiFePO4 (LFP)
Lithium iron phosphate battery chemistry.
Inverter
Converts DC battery power to AC household power.
Charge controller
Regulates charging from panels to battery.
MPPT
Maximum power point tracking controller.
PWM
Pulse-width modulation controller.
Peak sun hours
Hours of equivalent 1,000 W/m² sunlight per day.
Derate
Factor for real-world losses in solar output.
Open-circuit voltage (Voc)